Started By
Message

How are the expansion projects coming?
Posted on 8/1/13 at 1:07 pm
Posted on 8/1/13 at 1:07 pm
specifically MSU because i think they were the furthest along. I know they were suppose to have theirs partially ready for the opening of the season.
This post was edited on 8/1/13 at 1:07 pm
Posted on 8/1/13 at 1:08 pm to bbap
Do any msu posters have pics? Isn't South Carolina doing some renovating as well?
Posted on 8/1/13 at 1:19 pm to Broyota2
quote:
Isn't South Carolina doing some renovating as well?
I see the stadium on my way to work, no major renovations. We got the jumbotron last year. Some new athletic facilities, but nothing major at WB.
This post was edited on 8/1/13 at 1:19 pm
Posted on 8/1/13 at 1:20 pm to bbap
we finished our lockerroom not to long ago. It went so well that we have the best in the SEC.
Posted on 8/1/13 at 1:22 pm to oklahogjr
yeah i remember that. im really only curious about stadiumb expansions though.
Posted on 8/1/13 at 1:23 pm to oklahogjr
quote:
we finished our lockerroom not to long ago. It went so well that we have the sweatiest in the SEC.
Fixed.
Posted on 8/1/13 at 1:23 pm to bbap
quote:
i found this link for MSU. They're gonna have to hurry if they plan on having people in seats. Unless its just that little small section at the bottom. LINK
Just the lower section is being used from what I heard from State fans.
ETA: not to sure, some State fans help me out
This post was edited on 8/1/13 at 1:25 pm
Posted on 8/1/13 at 1:23 pm to bbap
oh we're starting ours up in a year or two i believe.
Posted on 8/1/13 at 1:23 pm to bbap
quote:
They're gonna have to hurry if they plan on having people in seats. Unless its just that little small section at the bottom.
I think the bottom is going to be the only section open during the season. Seems like we will have less capacity this year.
Posted on 8/1/13 at 1:24 pm to bbap
Mizzou's hill relocation project and west side renovation/mild expansion is done. The next project of east side expansion has started ahead of schedule. They are expecting it to be ready for the 2014 season. That would be a full year ahead of schedule.
This post was edited on 8/1/13 at 1:25 pm
Posted on 8/1/13 at 1:24 pm to CapstoneGrad06
quote:
Fixed.
That's what happens when your players are hungry to win instead of sitting around counting rings.
Posted on 8/1/13 at 1:25 pm to Sev09
quote:
Death Valley now has the best and most advanced sound system in the nation. Also prettied up the North Endzone. The South Endzone is still all concrete framing though. Not much to see yet.
thanks sev but im an lsu fan.
Posted on 8/1/13 at 1:25 pm to bbap
Kentucky just hired it's architect and signed all the contracts recently. (nb4 :canhedrawinsomethingbetterthancrayon:). It's moreso a renovation than an expansion though. Even with the addition of 2,000+ club seats they're removing some rows for when they move the press box and such.
Construction is set to begin September 1st (in phases) and is supposed to conclude by the beginning of the 2015 season.
LINK
Construction is set to begin September 1st (in phases) and is supposed to conclude by the beginning of the 2015 season.
LINK
Posted on 8/1/13 at 1:25 pm to Tds & Beer
quote:
think the bottom is going to be the only section open during the season.
roger that
Posted on 8/1/13 at 1:26 pm to notsince98
quote:
Mizzou's hill relocation project and west side renovation/mild expansion is done
any pictures/link?
Posted on 8/1/13 at 1:26 pm to oklahogjr
Sorry for winning.
And having the best football facilities in the country.

And having the best football facilities in the country.

Posted on 8/1/13 at 1:27 pm to CapstoneGrad06
quote:
Sorry for winning.
don't lie you know you aren't
quote:
And having the best football facilities in the country.
I mean yalls are cute and all but come on even you don't believe this.
Posted on 8/1/13 at 1:28 pm to oklahogjr
yall please take that shite out of my thread. no one fricking cares.
Popular
Back to top
