Started By
Message
re: Dudy renovations
Posted on 5/26/17 at 8:53 am to linus
Posted on 5/26/17 at 8:53 am to linus
They doing a series of articles on Genespage about the project that doesn't require the premium membership to read. This is the link to the first article. Second article about the lofts supposed to post today.
Says the stadium will consist of two separate bowls with a walkway in between. They are planning for the lower bowl and outfield to be completed by the 2018 season. The upper level wont be completed in time, so 2,500-3,000 fewer seats in 2018 along with a makeshift press box. Small scale construction has started behind the right field fence, wont impact summer camps or fall scrimmages. Fewer number of home games expected next season.
LINK
Says the stadium will consist of two separate bowls with a walkway in between. They are planning for the lower bowl and outfield to be completed by the 2018 season. The upper level wont be completed in time, so 2,500-3,000 fewer seats in 2018 along with a makeshift press box. Small scale construction has started behind the right field fence, wont impact summer camps or fall scrimmages. Fewer number of home games expected next season.
LINK
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/SR_Icon.jpg)