Started By
Message
re: U Pig Stadium expansion update.
Posted on 6/13/17 at 9:12 am to Numberwang
Posted on 6/13/17 at 9:12 am to Numberwang
Steel is pretty much at the tallest point on the NEZ now. The elevator towers on the ends of the existing structure will close it in even more.
![](https://oxblue.com/pro/load_jpg/20170613/090819/3463e727e619c61b1aba482107c23a6e/7ead4bc1d052b460c00e7c773ce4859b/0.jpg)
![](https://oxblue.com/pro/load_jpg/20170613/090819/3463e727e619c61b1aba482107c23a6e/7ead4bc1d052b460c00e7c773ce4859b/0.jpg)
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/SR_Icon.jpg)