Started By
Message
re: Construction update
Posted on 6/29/16 at 2:19 pm to TSUNgummybear
Posted on 6/29/16 at 2:19 pm to TSUNgummybear
I will be pumped about however the NEZ ends up looking, see through or not. I don't know what to expect and I'm no expert, but if it's not going to be see through then they are doing it differently than I've ever seen.
Kyle Field had a steel frame but used multiple prefabricated concrete sections.
Like I said, I'm no expert but I was expecting something more like Kyle and ours is being done completely differently. I guess we'll see.
Edit: Not the damn triple deck structure
, the way they put the concrete sections onto the beams
Kyle Field had a steel frame but used multiple prefabricated concrete sections.
![](https://maroonreport.files.wordpress.com/2014/05/img_8565.jpg)
Like I said, I'm no expert but I was expecting something more like Kyle and ours is being done completely differently. I guess we'll see.
Edit: Not the damn triple deck structure
![](https://images.tigerdroppings.com/Images/Icons/IconLOL.gif)
This post was edited on 6/29/16 at 5:45 pm
Posted on 6/29/16 at 2:21 pm to Dorsal-Fin
God that is huge. We do not need that.
Latest Ole Miss News
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/SR_Icon.jpg)