Started By
Message

Construction at VHS
Posted on 6/24/13 at 4:38 pm
Posted on 6/24/13 at 4:38 pm
I didn't know this was happening. Looks great!
Posted on 6/24/13 at 4:38 pm to Landmass
Saw that earlier. really does look great. They also had a crane over there as of yesterday. Any idea what that is for?
This post was edited on 6/24/13 at 4:39 pm
Posted on 6/24/13 at 4:45 pm to Landmass
fricking Finally!
I dont know if I could have looked at that trashy chain link fence any longer.
I dont know if I could have looked at that trashy chain link fence any longer.
Posted on 6/24/13 at 4:47 pm to UMRealist
I think it's for the brick wall that's supposed to be in place of the chain link fence.
Posted on 6/24/13 at 5:20 pm to RebinFairfax
Only bad thing is all the landscaping will be gone. It's going to be turf up to the wall.
Posted on 6/24/13 at 5:22 pm to Landmass
Thank you. While we can't do the full deal, at least we can make it look a little bit classier. I say thank Bjork. 

Posted on 6/24/13 at 7:44 pm to Landmass
They are apparently building new ramps on the north side of the stadium instead of having people walk down the stairs all the way to get to the 100 sections.
Posted on 6/24/13 at 7:57 pm to Landmass
I love the brick, but wish they would replace some of the shrubs. The chain link fence and awful metal folding chairs always baffled me.
Posted on 6/24/13 at 11:18 pm to SwayzeBalla
DER TAKIN R TRAHDISHUNS!!!!
Posted on 6/25/13 at 12:00 am to pankReb
As long as they make it look as close to Bama's as possible. But i think ours is going to be closed off and only for fans with tickets to sit down there.
Whenever they finally get around to revamping under the stadium, watch out, vaught Hemingway might accidentally be a pretty nice stadium.
Bjork
Whenever they finally get around to revamping under the stadium, watch out, vaught Hemingway might accidentally be a pretty nice stadium.
Bjork

Posted on 6/25/13 at 12:19 am to RebelExpress38
All of this minor cosmetic stuff is about 10 years overdue.
It should have been done along with the SEZ expansion.
Boone
It should have been done along with the SEZ expansion.
Boone

Posted on 6/25/13 at 12:21 am to Landmass
Oh they also "built" a halftime locker room. Which I'm sure we knew they were doing. I can't see why this wasn't done years ago. I mean because it made a lot of sense to walk five miles during halftime to the locker room while the visiting team may walk 100 yards tops.
Posted on 6/25/13 at 8:20 am to Landmass
That is gonna look soo good
So someone decribe to me these ramps that will be for the 100 sections?

So someone decribe to me these ramps that will be for the 100 sections?
Posted on 6/25/13 at 8:50 am to RebFeBrees
So they're remodeling the IPF, building a new locker room in the stadium, adding brick to the interior, and building new ramps?
Posted on 6/25/13 at 8:52 am to 478rebel
Halftime lockerroom was needed badly.
Posted on 6/25/13 at 12:17 pm to DrunkenStuporMan
Does anyone have a rough idea of the timeline for the bowling in of the NEZ?
Latest Ole Miss News
Back to top
