Started By
Message
re: Official College Baseball Stadium Review
Posted on 2/16/12 at 1:14 pm to bbap
Posted on 2/16/12 at 1:14 pm to bbap
quote:
I wish they would get to work on the Hall of Fame though. That will be a great addition to the box.
Care to elaborate?
I remember them talking about building the new Box in phases and the addition of suites is the only thing that has been done since the initial construction.
Searching has come up with nothing.
ETA: They did add the right field home run bleachers, but that wasn't part of the initial plan so I doubt it was in any part of the "phases."
This post was edited on 2/16/12 at 1:16 pm
Posted on 2/16/12 at 1:17 pm to absolute692
Yes the Hall of Fame was never scheduled for the first phase. At least i dont believe. That's why im curious if it will be the next project since the suites are finished.
Here is an old pdf link. See page 5 and 6 where it mentions the hall of fame. Initial plans were for 1900 square feet. I have no idea if that has changed or if they even plan on building a hall of fame now. It is suppose to be in the building along the 3rd base line.
LINK
Here is an old pdf link. See page 5 and 6 where it mentions the hall of fame. Initial plans were for 1900 square feet. I have no idea if that has changed or if they even plan on building a hall of fame now. It is suppose to be in the building along the 3rd base line.
LINK
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/SR_Icon.jpg)