Started By
Message
re: Somebody left their hat on my desk
Posted on 12/20/11 at 3:46 pm to junkfunky
Posted on 12/20/11 at 3:46 pm to junkfunky
Memphis, the only asbestos found was the insulation on the plumbing pipe elbows.
Yeah it's been a pain my arse for three weeks. Repointing all the brick on the outside. Replacing a lot of broken Spanish tiles on the roof. New flat roof. All the windows are getting replaced. Adding on a lobby. Gutting the inside. Slight structural modifications in the basement. And yeah the architect did half arse job. It's a cool arse building though.
quote:
FWIW, I hate renovation jobs. As-builts usually suck and most architects don't know how to handle them properly. Are y'all just dressing up the finish or are you doing any structural modifications.
Yeah it's been a pain my arse for three weeks. Repointing all the brick on the outside. Replacing a lot of broken Spanish tiles on the roof. New flat roof. All the windows are getting replaced. Adding on a lobby. Gutting the inside. Slight structural modifications in the basement. And yeah the architect did half arse job. It's a cool arse building though.
Popular
Back to top
![logo](https://images.tigerdroppings.com/images/layout/SR_Icon.jpg)