Started By
Message
re: How are the expansion projects coming? Part II
Posted on 2/25/15 at 5:08 pm to p_bubel
Posted on 2/25/15 at 5:08 pm to p_bubel
I will be utterly shocked if yall get that done before first home game.
Not completely done, but enough to pass code and let people in there for games. It's been raining a bunch in SE texas lately.
It looks as if you are 12 months away from completion.
Can you please NOT move the Bama game to Houston's reliant stadium? I don't want their shitty field messing with our players. Thanks!
Not completely done, but enough to pass code and let people in there for games. It's been raining a bunch in SE texas lately.
It looks as if you are 12 months away from completion.
Can you please NOT move the Bama game to Houston's reliant stadium? I don't want their shitty field messing with our players. Thanks!
This post was edited on 2/25/15 at 5:09 pm
Posted on 2/25/15 at 5:18 pm to cjared036
It'll get done.
(I believe they're ahead of schedule already)
(I believe they're ahead of schedule already)
Posted on 2/26/15 at 9:04 am to cjared036
quote:
I will be utterly shocked if yall get that done before first home game.
Not completely done, but enough to pass code and let people in there for games. It's been raining a bunch in SE texas lately.
It looks as if you are 12 months away from completion.
Can you please NOT move the Bama game to Houston's reliant stadium? I don't want their shitty field messing with our players. Thanks!
Running ahead of schedule on Kyle. The looks are deceiving as so much of the work to this point has been destruction and removal of the old structure as well as setting the foundation of the new structure. Much of the new facility is already prefabbed and just needs to be put in. The "look" of the construction will hit warp speed soon.
Posted on 2/26/15 at 9:13 am to cjared036
We're using steel rather than concrete, so it's going to go up really fast. I think they'll have all the steel in place by late March, if not before, and I would expect all the risers to be in place by mid-June. The real race will be to complete the finish on interior spaces like the suites and club--that's where the time pressure will be.
Popular
Back to top
Follow SECRant for SEC Football News