Started By
Message

re: Tiger Stadium renovations to begin in February

Posted on 12/2/11 at 8:30 pm to
Posted by bbap
Baton Rouge, LA
Member since Feb 2006
96074 posts
Posted on 12/2/11 at 8:30 pm to
yeah if the talks of bowling the south endzone are even remotely true they wont bother replacing that scoreboard any time soon.
Posted by Gtiger9757
Baton Rouge
Member since Sep 2008
8730 posts
Posted on 12/2/11 at 8:47 pm to
quote:

yeah if the talks of bowling the south endzone are even remotely true



I don't see that happening in the near future. It looks they are going to be building a plaza outside of the SEZ according to the renderings.

I would like to see them renovate the entire stadium inside and out before they expand.


The only thing I do not like with the proposals is the goofy looking Tiger Stadium sign up top. Everyone knows what it is, don't need to plaster it up there like that.
This post was edited on 12/2/11 at 8:51 pm
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow SECRant for SEC Football News
Follow us on Twitter and Facebook to get the latest updates on SEC Football and Recruiting.

FacebookTwitter