Started By
Message
re: Kyle Field and other Facility Upgrades
Posted on 6/27/14 at 8:40 am to TbirdSpur2010
Posted on 6/27/14 at 8:40 am to TbirdSpur2010
quote:
It's going to be very interesting when A&M starts winning a couple against them.
Don't get greedy
Posted on 6/27/14 at 11:49 am to Captain Crown
You know you want A&M to win some. We get gotta the hate going again.
Posted on 6/27/14 at 2:21 pm to Bob Ag
Here is some Big 12 vs SEC perspective.
61k for 3rd largest. I think when LSU finishes they'll be 3rd... Or maybe BAMA. Either way it'll be just above 100k.
quote:
Iowa State: Jack Trice Stadium Constructed: 1975 Recent renovation: 2007 Capacity: 56,800 Coming soon: Iowa State will have the Big 12's third-largest stadium in August 2015 when a recently announced $60 million expansion project is completed. Jack Trice Stadium is getting a new south end zone side, with upper and lower bowls, premium club seating and a new HD video board. The project will boost capacity to 61,000.
61k for 3rd largest. I think when LSU finishes they'll be 3rd... Or maybe BAMA. Either way it'll be just above 100k.
Posted on 6/27/14 at 3:03 pm to Captain Crown
quote:
Don't get greedy
But I'm a Texan-American
Posted on 6/27/14 at 9:40 pm to TbirdSpur2010
Finally putting in the south screens
Posted on 6/27/14 at 11:18 pm to WhiskerBiscuitSlayer
That pic makes it look pretty intimidating. You are completely surrounded now, and the field looks sunk down in there. Not sure if they will raise it when they start laying the grass though. can't wait to hear how loud it's going to be.
Posted on 6/27/14 at 11:41 pm to betweenthebara
quote:
Not sure if they will raise it when they start laying the grass though. can't wait to hear how loud it's going to be.
Actually I believe I heard that they had another 6 inches of dirt to remove after they got all of the cranes and steel out. Not sure if they have already done that or not at this point.
Posted on 6/28/14 at 12:48 pm to WhiskerBiscuitSlayer
Is there a 3d seating site out yet for new kyle? I thought there was one posted in this thread but I'm having no luck.
Posted on 6/28/14 at 1:22 pm to TbirdSpur2010
It was posted over in that thread on the main board like ten pages back. I can't find it either though.
Posted on 6/28/14 at 2:08 pm to WhiskerBiscuitSlayer
Posted on 6/29/14 at 5:39 pm to TbirdSpur2010
NSIAP
This post was edited on 6/29/14 at 5:41 pm
Posted on 6/29/14 at 7:12 pm to Dr RC
It's wild watching it like that.
Posted on 7/1/14 at 6:44 pm to WhiskerBiscuitSlayer
Video board going up:
Long distance shot:
Long distance shot:
Posted on 7/1/14 at 9:15 pm to WhiskerBiscuitSlayer
Got my 2014 seats. I'm in the S/SE 2nd deck. Killer all seats compared to the top of the damn zone last year.
Posted on 7/1/14 at 11:32 pm to WhiskerBiscuitSlayer
Still can't get over that second shot
Gonna be there for a coupld of days in August. Can't wait to lay eyes on the ol' gal
Gonna be there for a coupld of days in August. Can't wait to lay eyes on the ol' gal
Posted on 7/2/14 at 4:19 pm to TbirdSpur2010
Anyone know what's up with the 2 middle sections on the lower east side? Are they getting special types of benches?
Posted on 7/2/14 at 4:38 pm to ColoradoAg03
That's "Prime East Bench," not student section, so I imagine there is going to be some designation to tell the difference
Posted on 7/3/14 at 9:38 pm to tmc94
Hope this is not a stupid question. For you construction gurus: in terms of time, difficulty, and complexity, what percentage of the overall project will be complete at the end of Phase 1?
Latest Texas A&M News
Popular
Back to top
Follow SECRant for SEC Football News