Started By
Message

re: Transforming the Flagship

Posted on 2/12/14 at 12:14 pm to
Posted by Porker Face
Midnight
Member since Feb 2012
15320 posts
Posted on 2/12/14 at 12:14 pm to
Just talked to vice chancellor for facilities yesterday about whats in the works

Redo mullins, remove stacks and make more student study area + coffee shop

Interior renovation of Memorial Hall ibcluding tearing out mezannine to restore original ballroom as a classroom. Also install original light fixtures and chandaileers

$18m addition of another wing to John White Engineering Hall

New entrances to campus at all entry points - "thresholds" in UA speak

Widening of razorback road will begin this summer (actually utility relocates are underway now) to Leroy pond. Next is maple from garland to razorback. This will put pressure on everyone to complete the part by the stadium which will be very difficult to construct and very expensive. Huge retaining walls are required and that part alone will cost $6 million
This post was edited on 2/12/14 at 12:24 pm
Posted by I Ham That I Ham
Oh Lord, it's hard to be humble
Member since Jan 2012
10773 posts
Posted on 2/12/14 at 12:28 pm to
wow. all of that sounds amazing. By "entrances" do you mean like Garland and Maple gates?
Posted by Hogwall Jackson
Denver
Member since Feb 2013
5052 posts
Posted on 2/12/14 at 12:53 pm to
Construction on the Union starts August 1st as well apparently. That is going to be a cluster frick
Posted by Porker Face
Midnight
Member since Feb 2012
15320 posts
Posted on 2/12/14 at 2:29 pm to
Entrances from when you turn off MLK onto Razorback or Stadium. Those brick things

They also are going to add one on Garland coming south up the hill toward the Northwest Quads
Posted by Feral
Member since Mar 2012
12400 posts
Posted on 2/12/14 at 4:24 pm to
quote:

Just talked to vice chancellor for facilities yesterday about whats in the works

Redo mullins, remove stacks and make more student study area + coffee shop

Interior renovation of Memorial Hall ibcluding tearing out mezannine to restore original ballroom as a classroom. Also install original light fixtures and chandaileers

$18m addition of another wing to John White Engineering Hall

New entrances to campus at all entry points - "thresholds" in UA speak

Widening of razorback road will begin this summer (actually utility relocates are underway now) to Leroy pond. Next is maple from garland to razorback. This will put pressure on everyone to complete the part by the stadium which will be very difficult to construct and very expensive. Huge retaining walls are required and that part alone will cost $6 million



That's great. Mullins definitely needs an interior renovation, and a coffee bar is long overdue. It was a PITA to go to the Union if you wanted coffee or a drink, so a coffee bar and study areas are pretty good.

Of course, nothing was better than just holing up into one of those random study areas upstairs throughout the stacks and knocking out some work.

As for the gates, those are great and necessary additions. I always felt like for such a grand campus, we essentially had no grand entrances. I really like the Pi Phi gate.
first pageprev pagePage 2 of 2Next pagelast page
refresh

Back to top
logoFollow SECRant for SEC Football News
Follow us on Twitter and Facebook to get the latest updates on SEC Football and Recruiting.

FacebookTwitter