Started By
Message
re: Construction at VHS
Posted on 6/25/13 at 12:18 pm to DrunkenStuporMan
Posted on 6/25/13 at 12:18 pm to DrunkenStuporMan
The name is Octavious Rex
Posted on 6/25/13 at 1:17 pm to Grateful Reb
After the arena is complete I believe
Posted on 6/25/13 at 1:41 pm to SwayzeBalla
quote:
After the arena is complete I believe
Damn, seems so far away
Posted on 6/25/13 at 2:47 pm to Grateful Reb
quote:
Damn, seems so far away
Cut dat check, big baller. shite will speed up with some quickness.
Posted on 6/26/13 at 2:47 pm to Fipitan
I'd rather the baskeball team suffer until after football is sorted.
Posted on 6/26/13 at 2:54 pm to Landmass
That's the equation of life.
Posted on 6/26/13 at 3:23 pm to Grateful Reb
quote:
Damn, seems so far away
If we get all the money in then they will build earlier. I believe they will start to market the NEZ CGA's once construction on the arena begins. CGA roooooooll in fast, so that will be a big boost in the number. Once they decide on the naming rights as well you should see that number jump up a lot.
I really believe once state breaks the attendence record in MS in '14 people we get up off their asses and get that $$$ in. I honestly expect to have it bowled in by the start of the 2017 season. Would not be shocked if it were finished by 2016 season.
This post was edited on 6/26/13 at 3:24 pm
Posted on 6/26/13 at 3:43 pm to Whereisomaha
We should sell standing room only tickets too. We have plenty of standing room around and don't capitalize on it.
Posted on 6/26/13 at 4:00 pm to Landmass
quote:
This is true, but no question its needed more for basketball.
Posted on 6/26/13 at 4:35 pm to UMRealist
quote:
its needed more for basketball.
Posted on 6/26/13 at 6:28 pm to TotalRebel
quote:
That's the equation of life.
False. The equation of life is as follows.
Pussy > everything else.
Posted on 6/26/13 at 9:19 pm to Landmass
Will the halftime locker room and IPF be done before the season starts?
Posted on 6/26/13 at 9:26 pm to WithaRebelYell
quote:
Will the halftime locker room and IPF be done before the season starts?
Yes. Renovations to current locker room will be completed before camp starts as well
Posted on 6/26/13 at 11:16 pm to Whereisomaha
Will you no longer be able to walk thru that area anymore? Will it be completed connected to the stadium?
I also don't agree with just bowling in the stadium before finishing the basketball arena. You cant ask Kennedy to show results and not give him ANYTHING to show it with. Just think if in 2015 the new basketball arena was done and you are going after a Malik Newman. At least Kennedy has something to sell.
I also don't agree with just bowling in the stadium before finishing the basketball arena. You cant ask Kennedy to show results and not give him ANYTHING to show it with. Just think if in 2015 the new basketball arena was done and you are going after a Malik Newman. At least Kennedy has something to sell.
Posted on 6/27/13 at 6:57 am to Doresrules
quote:
Just think if in 2015 the new basketball arena was done and you are going after a Malik Newman. At least Kennedy has something to sell.
This^^^^ Unless you hate basketball
Posted on 6/27/13 at 8:55 am to Doresrules
No it will not be connected, but a little closer with the new meeting room being an ad on in between the original IPF and VHS
Posted on 6/27/13 at 11:02 am to Whereisomaha
Renovating the West side of the stadium is a bigger need than even the basketball arena. It's embarrassing.
Posted on 6/27/13 at 11:17 am to Landmass
quote:
Renovating the West side of the stadium is a bigger need than even the basketball arena. It's embarrassing.
Yeah, but the Tad Pad is even more embarrassing
Latest Ole Miss News
Popular
Back to top
Follow SECRant for SEC Football News