Started By
Message

re: SEC printing press is working

Posted on 1/20/16 at 5:20 pm to
Posted by JesusQuintana
St Louis
Member since Oct 2013
33366 posts
Posted on 1/20/16 at 5:20 pm to
I'd like to see them build up the south EZ to match the current height of the new East side structure. That would be possibly a bit more regular seating, but mostly football operations and suites. New locker room is a must in this complex.

After that, add permanent seating to each side of the press box to mirror the height of the East/South structure.

As for the north EZ. I agree. Keep people off the rocks for sure, and grass completely preferably. The renovations they did there actually look very nice and it would look good on TV if people could see it. If that causes too much of an uproar, then add permanent seating on both sides of the rocks but make the M off limits during games.

Finally, bring down the current jumbotron. You could repurpose it on top of the South EZ complex if needed, but it's too small and too far from the field. Need one twice as big and it needs to be moved closer to the field after they reconfigured the hill.
Posted by Mizzoumatt
Columbia, Missouri
Member since May 2012
387 posts
Posted on 1/20/16 at 10:12 pm to
I hope BO is pressing the south end zone project as hard as HCGP was. I'm disappointed that I haven't heard anything about it from Rhoades or BO
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow SECRant for SEC Football News
Follow us on Twitter and Facebook to get the latest updates on SEC Football and Recruiting.

FacebookTwitter