Started By
Message

Another off topic: Tuscaloosa road construction

Posted on 4/12/19 at 3:45 pm
Posted by East Coast Band
Member since Nov 2010
62721 posts
Posted on 4/12/19 at 3:45 pm
Who's bright idea was it to perform major road construction concurrently on the two major North - South routes through town?
McFarland and Lurleen Wallace are a shite fest right now with seemingly no end in sight.
And what's the end game? Just some level sidewalks and new curbing?
Posted by Goldtide1
Member since Oct 2018
2108 posts
Posted on 4/12/19 at 3:55 pm to
Yea it’s very frustrating. Apparently the city was awarded separate grants for the different projects, but they all expire at the same time. They had to be used or the city lost them. It sucks that we can’t get anywhere in the city in under 20 minutes right now.
This post was edited on 4/12/19 at 3:58 pm
Posted by pvilleguru
Member since Jun 2009
60453 posts
Posted on 4/12/19 at 4:55 pm to
quote:

And what's the end game? Just some level sidewalks and new curbing?


Lurleen Wallace: They are moving the on-street parking from the main road to the side streets. They are adding left and right turn lanes on Lurleen Wallace to increase capacity. The plan was to have it finished by December 2019. Weather may have pushed that back just a little bit.

McFarland: They are about to add lanes to the interstate, which means they are replacing the bridge over McFarland. On McFarland, they are getting ready to replace the bridge and at the same time creating a SPUI (single point urban interchange) so that both off-ramps will become one intersection and use only one signal.
Posted by East Coast Band
Member since Nov 2010
62721 posts
Posted on 4/12/19 at 5:30 pm to
There also will be an added suspension bridge over McFarland.
Posted by pvilleguru
Member since Jun 2009
60453 posts
Posted on 4/12/19 at 5:36 pm to
Correct. They are doing a suspension bridge since they can't put columns in the middle of the SPUI.
Posted by pvilleguru
Member since Jun 2009
60453 posts
Posted on 4/13/19 at 8:40 am to
Also, this is about to happen at 69/Skyland...

Posted by pvilleguru
Member since Jun 2009
60453 posts
Posted on 4/13/19 at 2:48 pm to
They are also putting some roundabouts at the bottom of the ramps off 69 at 5th street (the exit for city cafe, Northport Dreamland, wtc)
Posted by crimson crazy
Member since Oct 2008
20506 posts
Posted on 4/13/19 at 6:31 pm to
69 is ALDOT, McFarland is the city.
Posted by pvilleguru
Member since Jun 2009
60453 posts
Posted on 4/13/19 at 6:36 pm to
quote:

McFarland is the city.
ALDOT was/is heavily involved with McFarland. It's a US route.
This post was edited on 4/13/19 at 6:40 pm
Posted by RollDatRoll
Who Dat. Roll Tide.
Member since Dec 2010
12245 posts
Posted on 4/15/19 at 3:35 pm to
quote:

And what's the end game? Just some level sidewalks and new curbing?


Lurleen Wallace is more than just sidewalks. The entire infrastructure needed repair. All the pipes were super old and in need of replacing. The end result will be fantastic and much needed.
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow SECRant for SEC Football News
Follow us on Twitter and Facebook to get the latest updates on SEC Football and Recruiting.

FacebookTwitter