Started By
Message

re: Electrician Help: Direct burial wire size from house panel to feed shed 60A sub panel

Posted on 5/15/24 at 9:17 am to
Posted by notsince98
KC, MO
Member since Oct 2012
18082 posts
Posted on 5/15/24 at 9:17 am to
quote:


2224 should be enough for a 100A subpanel, but I’m not an electrician. Don’t forget a ground rod at the subpanel, separate the neutrals and grounds, and a disconnect if it’s a detached building.


Installing a ground rod at the subpanel could be more complicated. If that is done, you typically dont want to run a ground from the main panel. you'd just run 2 hots and a neutral. Then you'd need to do a neutral-ground bond at the sub-panel and have that ground-rod bonded to the ground bus in the sub panel.

If you run the ground from the main panel to the sub-panel, you dont need the ground rod and you dont do another neutral-ground bond. Both ways are acceptable.
This post was edited on 5/15/24 at 9:18 am
Posted by cgrand
HAMMOND
Member since Oct 2009
38955 posts
Posted on 5/15/24 at 9:23 am to
quote:

If you run the ground from the main panel to the sub-panel, you dont need the ground rod and you dont do another neutral-ground bond
thats what i did
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram