So the 540 expansion has begun

Posted on 2/21/14 at 5:16 pm
Posted by Marty McFrat
Arkansas hell
Member since Feb 2011
14827 posts
Posted on 2/21/14 at 5:16 pm
I've heard it'll take 7 years? I fricking hope not.
Posted by VagueMessage
Fayetteville, AR
Member since Jun 2013
3901 posts
Posted on 2/21/14 at 5:18 pm to
It's going to take Fort Smith probably two years just to repair a stretch of theirs. I wouldn't doubt it.

Haven't they been building the other side of that split highway on Old Missouri/Crossover for well over a year now?
Posted by DaleDenton
Member since Jun 2010
42346 posts
Posted on 2/21/14 at 5:24 pm to
quote:

It's going to take Fort Smith probably two years just to repair a stretch of theirs. I wouldn't doubt it.



They've been replacing the bridges on 540 for over a year now in Ft. Smith, everyone except the river bridge was being replaced.

The interchange at Chaffee Crossing is finished, just have to pave from VB to Texarkana now, lol.
Posted by VagueMessage
Fayetteville, AR
Member since Jun 2013
3901 posts
Posted on 2/21/14 at 5:26 pm to
I'm pretty stoked about the new on-ramp in Fayetteville. I don't know why the only way to get on the freeway heading north on College for so long has been to make that u-turn at Joyce.
Posted by Marty McFrat
Arkansas hell
Member since Feb 2011
14827 posts
Posted on 2/21/14 at 5:30 pm to
That is much needed as well! Plus the new off ramp they are putting in right there too.
Posted by WonderWartHawg
Member since Dec 2010
10396 posts
Posted on 2/21/14 at 6:02 pm to
If they say 7 then it will actually take 10.
Posted by Porker Face
Midnight
Member since Feb 2012
15312 posts
Posted on 2/21/14 at 7:11 pm to
It will take longer than that

Its not all funded yet
Posted by Porker Face
Midnight
Member since Feb 2012
15312 posts
Posted on 2/21/14 at 7:12 pm to
Also it started last year when they widened between MLK and Wedington
Posted by Litigator
Hog Jaw, Arkansas
Member since Oct 2013
7535 posts
Posted on 2/21/14 at 7:13 pm to
What is it going to do exactly?
Posted by CtotheVrzrbck
WeWaCo
Member since Dec 2007
37538 posts
Posted on 2/21/14 at 7:15 pm to
If the Highway commission says 7 expect 25.
Posted by Porker Face
Midnight
Member since Feb 2012
15312 posts
Posted on 2/21/14 at 7:16 pm to
6 lanes between MLK exit in Fayetteville and Exit 88 in Bentonville. Expect interchange improvements at almost all of the exits as well

Highway 412 bypass will begin in 2015 (ROW and utility relocates currently underway) between I-540 and Highway 112. To be completed as a controlled access facility in 2018. Long term this will be the Springdale Bypass (put down the bong...not for 30+ years though)

Also Bella Vista Bypass has taken some hits recently. Missouri has no funding

AHTD plans to put a roundabout at Exit 88 in the interim before eventually building a full SPUI where I-49 will join the BVB



Further info available on the Connecting Arkansas Program website, and current info can now be found on the all-new iDriveArkansas website

Feel free to ask other road-related questions throughout the state. I'm "in the know", you might say
This post was edited on 2/21/14 at 7:37 pm
Posted by Litigator
Hog Jaw, Arkansas
Member since Oct 2013
7535 posts
Posted on 2/21/14 at 7:19 pm to
Thx.
Posted by Marty McFrat
Arkansas hell
Member since Feb 2011
14827 posts
Posted on 2/21/14 at 7:22 pm to
Looks like they are doing it in sections too. It's starts at wedington and goes for a bit then stops then picks back up around wagon wheel
Posted by Porker Face
Midnight
Member since Feb 2012
15312 posts
Posted on 2/21/14 at 7:25 pm to
Yes, they are individually bidding it all

They started with the cheapest sections to show the public they are dedicated to doing the whole thing

Going will naturally get slower as the more difficult (expensive) projects are undertaken. Last will be a rework of exit 66 and 67
Posted by DaleDenton
Member since Jun 2010
42346 posts
Posted on 2/21/14 at 7:26 pm to
quote:

6 lanes between MLK exit in Fayetteville and Exit 88 in Bentonville


Just driving through there, where it first cuts back to two lanes, every bridge/overpass is going to have to be worked on to allow adequate room...
Posted by Porker Face
Midnight
Member since Feb 2012
15312 posts
Posted on 2/21/14 at 7:28 pm to
quote:

Just driving through there, where it first cuts back to two lanes, every bridge/overpass is going to have to be worked on to allow adequate room


Pretty much. And thats why the other widenings are more expensive...bridge construction is really fricking expensive

Good news...all new bridges are currently being designed for a future 8-lane I-540 (ex. Don Tyson Parkway bridge). That'll be the day...
Posted by Porker Face
Midnight
Member since Feb 2012
15312 posts
Posted on 2/21/14 at 7:30 pm to
Also I thought I should put this here



Walmart buys 126.1 acres on Bentonville/Bella Vista border for $4M

If Walmart got involved, a lot of this could be accelerated. Some think they plan to build a shiny new world headquarters skyscraper on the property...
Posted by Marty McFrat
Arkansas hell
Member since Feb 2011
14827 posts
Posted on 2/21/14 at 7:44 pm to
Wouldn't that go against their whole motto every day low cost? That's why their current buildings look like a shite at HQ
Posted by Porker Face
Midnight
Member since Feb 2012
15312 posts
Posted on 2/21/14 at 7:58 pm to
Its just speculation

Sam's Club HQ is nice



2101 S.E. 25th Street, Bentonville, Ark
This post was edited on 2/21/14 at 7:59 pm
Posted by hawgndodge
Member since Jun 2009
4731 posts
Posted on 2/21/14 at 9:35 pm to
i'm hoping that before I die Fort Smith to Texarkana is done. I would cry tears of joy. I'm 35.
first pageprev pagePage 1 of 2Next pagelast page

Back to top
logoFollow SECRant for SEC Football News
Follow us on Twitter and Facebook to get the latest updates on SEC Football and Recruiting.

FacebookTwitter