Started By
Message

re: Houseboat construction

Posted on 11/15/23 at 2:39 pm to
Posted by tigerbait703
Chackbay, La
Member since Sep 2007
655 posts
Posted on 11/15/23 at 2:39 pm to
The build process and the aftermath.



















And then Ida had to shower her arse...





But we salvaged the pontoons and some of the joist. Started over and now it currently looks like this:




Posted by cgrand
HAMMOND
Member since Oct 2009
39032 posts
Posted on 11/15/23 at 2:43 pm to
dang not bad!
really like the vaulted ceiling

we built V1.0 and floated it to its spot 2 weeks before Andrew. All we had left was the floor…

drug it back to calumet and started over but made it so big we couldn’t get under the bridge at the wax landing LOL. Had to drag it back again and go down the river the long way
first pageprev pagePage 1 of 1Next pagelast page
refresh

Back to top
logoFollow TigerDroppings for LSU Football News
Follow us on Twitter, Facebook and Instagram to get the latest updates on LSU Football and Recruiting.

FacebookTwitterInstagram