Started By
Message
Auburn Football Locker room gets renovated
Posted on 4/23/15 at 3:04 pm
Posted on 4/23/15 at 3:04 pm
Posted on 4/23/15 at 3:10 pm to joeyb147
At least they're finally working with the industrial design of the facility instead of having drop tile ceilings.
Posted on 4/23/15 at 4:00 pm to TheSandman
quote:
At least they're finally working with the industrial design of the facility instead of having drop tile ceilings.
I strongly agree. The taller ceiling doesn't make it look so cramped. I think the AD needs to move on from whatever that typeface is we've been using...at least I'm getting tired of it.
It seems as though the locker room is renovated every 2 years or so.
This post was edited on 4/23/15 at 4:08 pm
Posted on 4/23/15 at 4:09 pm to AUNashville
They brightened it up, took out a lot of unnecessary bulk and made the actual locker itself a bit more practical. More cubby holes, locking cabinets for safer storage, etc.
Here's the '12 redo
Here's the '12 redo
This post was edited on 4/23/15 at 4:11 pm
Posted on 4/23/15 at 4:20 pm to TheJones
quote:
Here's the '12 redo
Pretty sure you are looking at two different locker rooms. The SI article is about the athletic complex locker room, not JHS.
Posted on 4/23/15 at 4:34 pm to Rhymenoceros
quote:
uote:
Here's the '12 redo
Pretty sure you are looking at two different locker rooms. The SI article is about the athletic complex locker room, not JHS.
You are correct, two different locker rooms. JH will be redone during the renovation, but they are only used 8-9 times a year. The practice locker rooms is what needs to be enhanced, we really need a new football operations building.
ETA: Waterfall required.
This post was edited on 4/23/15 at 4:37 pm
Posted on 4/23/15 at 5:05 pm to TheJones
quote:
locking cabinets for safer storage, etc.
You can thank Nick Marshall for that...
Oh sorry thought I was on the Rant
Latest Auburn News
Popular
Back to top
Follow SECRant for SEC Football News